03 Process
Done right, in a day
1
Grind the concrete
We take off the top layer so everything bonds properly. Any old coating is removed, and oil stains typically come right off.
2
Repair the concrete
Polymer Mender fills cracks, pitting and chipping. Cracks are cut into a V-groove, filled, then ground again.
3
Apply polyurea basecoat
This bonds our coating to the floor and ties the entire system together.
4
Broadcast decorative flake
Immediately after the basecoat, flake is spread over the whole floor.
5
Set and scrape
The flake and basecoat set in about an hour, then the excess flake is scraped off.
6
Polyaspartic topcoat
The final layer protects from the top down, with Shark Grip added for traction.





What we coat
- Garages. Residential and commercial floors.
- Basements. Floors, plus block and poured foundation walls.
- Patios. Including porches, steps and other vertical surfaces.
- Sidewalks. Walkways, entry paths and approach aprons.
02 Epoxy vs. Polyaspartic
Why our floors beat epoxy
Epoxy
Road saltNot salt resistant.
UV / sunlightCan fade, discolor, or yellow over time.
Install timeAround 5 days before walking on it; multi-day install.
FlexibilityHarder and more brittle; prone to cracking or crumbling.
TemperatureSlab must be at least 50°F.
Polyurea / Polyaspartic
Road saltSalt resistant.
UV / sunlightWill not fade, discolor, or yellow.
Install time24 hours to walk on; 48-hour cure; typically a one-day install.
FlexibilityOnly a few mils thick; flexes with movement or heaving in the slab.
TemperatureCan be installed year-round.
65% off installation · extra 10% for spring bookings
Ready for a floor you stop thinking about?
Free estimate and a lifetime warranty.
